Interlock & paver installation in the West Island.

Driveways, walkways, side alleys and patios in modern Techo-Bloc, Permacon and Rinox pavers, built on a drained base that keeps them flat through Montréal winters.

Interlock built from the bottom up.

Most paver problems in Montréal start underneath. A shallow, dense base holds water, the water freezes and expands, and the pavers heave in winter and sink unevenly in spring.

We excavate 12 to 18 inches down to stable ground and rebuild with geotextile fabric, 8 to 14 inches of compacted 3/4-inch clear stone and a 1-inch bed of 1/8-inch clear stone. Water drains straight through instead of freezing under your pavers. It takes more time and material, and it’s why our work stays flat.

12–18 inchesExcavation on every paver project
2–4 daysTo get your 3D renders

Paver installation

Paver driveways, walkways and patios.

  • Driveways – Paver installation01

    Driveways

    Built to take car weight, plows and salt without rutting or shifting.

  • Walkways & side alleys – Paver installation02

    Walkways & side alleys

    Clean, level paths from the driveway to the front door and backyard.

  • Patios – Paver installation03

    Patios

    Outdoor living space sized for your table, lounge or barbecue.

Process

How we install your pavers.

Book free consultation
  1. 01

    Design in 3D

    We meet on site, then return in 2–4 days with 3D renders of your layout, colours and borders, and a final price.

  2. 02

    Excavate 12–18 inches

    We dig down to stable ground and remove the soft soil that causes heaving and settling.

  3. 03

    Build a drained base

    Geotextile fabric, then 8–14 inches of compacted 3/4-inch clear stone so water drains through instead of freezing.

  4. 04

    Lay and edge

    A 1-inch bed of 1/8-inch clear stone, pavers laid to your pattern and Alliance Gator edging to lock it in.

  5. 05

    Joint and finish

    Alliance Gator resin-based permeable joint sand, compaction and a final sweep.

Planning

Planning your interlock driveway or patio.

What affects the price

The size of the area, how deep we need to excavate and how much soil comes out, access for our equipment, removing an existing driveway, the pavers you choose, and extras like borders, steps or lighting. You get a final price with your 3D design, before any work starts.

Choosing your pavers

We install Techo-Bloc, Permacon and Rinox pavers and slabs, from large modern formats to classic interlock patterns. You see your colours, sizes and borders in the 3D renders before you decide.

Replacing asphalt or old interlock

We remove the old surface and the old base down to stable ground, then rebuild on a drained clear-stone base. Like most of our paver projects, it usually takes 2 to 7 days on site.

Caring for your pavers

Sweep and rinse when needed, and shovel or plow as usual in winter. If a paver is ever damaged, it can be lifted and replaced on its own, without redoing the driveway.

Drainage test

Watch the water drain through in under 10 seconds.

We poured water straight onto one of our finished paver installations. It soaks through the Alliance Gator Nitro-X resin joint sand and down into the open-graded clear-stone base in under 10 seconds, instead of sitting on the surface.

Water that drains away can’t freeze under your pavers. That’s what keeps them flat through Montréal winters.

Our footage: water poured on a finished installation drains through the joints in under 10 seconds.

Materials we trust

  • Techo-Bloc
  • Permacon
  • Rinox
  • Alliance Gator

FAQ

Paver installation questions, answered.

How long does a paver project take?

Most projects take 2 to 7 days on site. Larger projects, like a full backyard with pavers, walls, lighting and turf, can take 2 to 4 weeks. We give you a schedule at the design consultation.

How much does a paver driveway or patio cost?

It depends on the size of the area, how deep we need to excavate, site access, the pavers you choose and whether you add walls, steps or lighting. We don’t publish price ranges. You get a final price at the second consultation visit, with your 3D renders, before any work starts.

Why do you excavate 12 to 18 inches deep?

Most paver failures in Montréal start underneath. Digging down to stable ground and rebuilding with open-graded clear stone lets water drain through instead of freezing under your pavers, so they stay flat through the freeze-thaw cycle.

What joint sand do you use?

Alliance Gator Nitro-X resin-based permeable joint sand on most projects. It lets water drain and holds up well to rain and weeds. On the rare projects where resin isn’t a fit, we use Alliance Gator G2 Maxx polymeric sand.

What does the 3-year guarantee cover?

The jointing material and levelling. If the joint sand fails or your pavers settle or shift out of level within three years, we come back and make it right.

Do you replace asphalt driveways with interlock?

Yes. We remove the asphalt and the old base, excavate 12 to 18 inches and rebuild on a drained clear-stone base before laying your pavers. Our pavers vs. asphalt guide compares the two if you’re still deciding.

When is the best time to install pavers?

We build from April to November. Booking your design consultation early in the year gets you an earlier spot in the season.